ALTO Won Sheraton Hotel Project

posted in: Project | 0

News from Harbin, recently, Alto successfully won the project in Harbin of Sheraton Hotel with its multifunctional dehumidification system. Due to its individual core technology, Alto multifunctional dehumidification system can totally satisfy the special needs of environmental-friendly, comfortable, faster in hotel.

1

According to the specific conditions of the swimming pool in the hotel, we ultimately determined to use the C-500, a complete dehumidification system taking advantage of the naturanlly dry outdoor air to control humidity and ventilate the facility while reducing the cost of operation. It can extract the latent heat from the dehumidification to heat the air and pool water, returning five units of heat energy for every unit energy it consumed, which has a recorded savings from 40% to 60% over the conventional outside air dilution systems.

Share this: